SHOP FOR
http://base-store.storehippo.com/
# 2514/U, 7th 'A' Main Road, Opp. to BBMP Swimming Pool, Hampinagar, Vijayanagar 2nd Stage. 560104 Bangalore IN
Tenettech E-Store
# 2514/U, 7th 'A' Main Road, Opp. to BBMP Swimming Pool, Hampinagar, Vijayanagar 2nd Stage. Bangalore, IN
+918023404924 //cdn1.storehippo.com/s/59c9e4669bd3e7c70c5f5e6c/ms.settings/5256837ccc4abf1d39000001/webp/59dafe26aef6e1d20402c4c3-480x480.png" info@tenettech.com
605d9fd7ae0305208a9b02e7 I/O Connectors SFP56 STACKED 2X8 RECEPTACLE ASSEMBLY //cdn1.storehippo.com/s/59c9e4669bd3e7c70c5f5e6c/605d9fd7ae0305208a9b02e9/webp/2340033-7_spl.png

zSFP+ Stacked I/O Interconnects

TE Connectivity's zSFP+ Stacked I/O Interconnects are fast single-channel I/O connectors that transfer data at 28Gbps NRZ and 56Gbps PAM-4. These pluggable interconnects are both backward-compatible to SFP/SFP+ products and hot-swappable with existing SFP+ connectors for fast system upgrades of 28-56Gbps. Alternatively, users can design in the zSFP+ connectors for 10-16Gbps data rates, establishing a progressive path to higher speeds. This upgradeability can result in long-term cost savings and eliminates the need to fully redesign for higher performance.

TT-MU-571-2340033-7
in stockINR 18292.50632
TE Connectivity
1 1
I/O Connectors SFP56 STACKED 2X8 RECEPTACLE ASSEMBLY

I/O Connectors SFP56 STACKED 2X8 RECEPTACLE ASSEMBLY

Sku: TT-MU-571-2340033-7
₹18,292.51


Sold By: tenettech
Features
  • Shipping in 10-12 Working Days

Description of product

zSFP+ Stacked I/O Interconnects

TE Connectivity's zSFP+ Stacked I/O Interconnects are fast single-channel I/O connectors that transfer data at 28Gbps NRZ and 56Gbps PAM-4. These pluggable interconnects are both backward-compatible to SFP/SFP+ products and hot-swappable with existing SFP+ connectors for fast system upgrades of 28-56Gbps. Alternatively, users can design in the zSFP+ connectors for 10-16Gbps data rates, establishing a progressive path to higher speeds. This upgradeability can result in long-term cost savings and eliminates the need to fully redesign for higher performance.